Garage update - for Rosemary.
So a week later and the garage is excavated and ready for the slab to be laid for the floor. All in, 40 tipper loads were needed to remove the spoil, which was mainly rock.
Before the full excavation, we had arranged delivery of materials for the hard landscaping round the house which will be complete later in the summer - 48tons of hardcore, 5tons of ballast, 8 tons of gravel and 12 pallets of Granite slabs. Once the garage had been excavated there would have been no option to get a machine to bring it up and everything mentioned would have had to be handballed....
Anyway, some more pictures of the works slab should be giong down mid June and walls beginning later in June.